Specification

  • STRUCTURE
    • RCC Framed Structure
  • LOBBY
    • Luxurious ground floor lobby flooring having vitrified Flooring
    • Upper floors lobby flooring in vitrified tiles & lift cladding in Granamite / Designer tiles
    • All lobby walls in plastic emulsion paint
    • Staircase in granite
  • LIFTS
    • Automatic Lifts of reputed make having speed
  • APARTMENT FLOORING
    • Vitrified tiles in living, dining, corridors, family and all other bedrooms
    • Anti-skid ceramic tiles in all Balconies
  • KITCHEN
    • Black granite counter with S.S sink
    • Vitrified tiles in flooring and dado upto 7' height above granite counter
    • Kota flooring and ceramic dado in the utility
  • PAINTING
    • External Walls with double mala (sand face)
    • All railings in enamel paint
    • Putty on all internal walls
  • PARKING
    • Adequate car parking facility on Ground Floor
  • SECURITY SYSTEM
    • Gated community with round the clock security
    • Video door phone with connectivity to surveillance through CCTV security y
  • EXTERNAL & INTERNAL DOORS
    • Main door with laminate on both sides
    • Other internal doors with wooden frames
    • Standard quality fittings for all doors
  • WINDOWS
    • Anodised aluminum windows with heavy sections
  • TOILETS
    • Anti-skid ceramic tiles for flooring
    • Standard quality sanitary and plumbing fixtures
    • Designer superior quality tiles on walls up to lintel level
    • Granite counter with ceramic wash basin in the master toilet and wash basins in other toilets.
  • ELECTRICAL
    • All electrical wiring is concealed with PVC insulation wires and modular switches
    • Sufficient power outlets and light points provided
    • TV, AC and Telephone points provided in Living Rooms and all bedrooms
    • ELCB and individual meters will be provided for each apartment
  • WATER
    • Uninterrupted 24 hours water supply through own Borewell
    • Pneumatic pressure system for watert
  • Disclaimer
    • Possession will be given after one month of settlement of all accounts
    • Documentation charges, stamp duty, service tax & common maintenance charges will be extra
    • Any new central or state Government taxes, it application shall have to be borne by the members
    • Extra work shall be executed after making full payment
    • Continuous default payment leads to cancellation
    • In case of delay in water supply, light connection, drainage work by authority, developers will not be responsible
    • Refund in case of cancellation will be mode within 30 days from the date of booking of same unit by a new client Administrative charges of 20,000/- & the amount of extra work (if any ) will be deducted from refund amount
    • Terrace rights & Future FSI rights will be exclusively of the developers only
    • Any plans, specification or information in this brochure cannot from part of an offer contract agreement and legal documents